BASF Plant of Sodium Methoxide and Boiler


Technical Information

Planta de Metilato de Sódio e Central de Cogeração de Energia
Customer: BASF
Location: Guaratinguetá / SP
Built-up Area: 2.660 m²
Conclusion: May / 2011

 

BASF, chemicals company, Libercon Client since 2010, after construction of the BASF Transelevador, hires Libercon Engenharia for the construction of its BASF Plant of Sodium Methoxide and Boiler in 2011.

The development, in the same location of the Transelevador, approximately 2.600 m² has the structure for production and storage of chemical products sold by the company.




Av. das Nações Unidas, 11.857 - 2nd floor Zip Code 04578-000 | São Paulo, SP - Brazil